翻訳と辞書
Words near each other
・ Carmel School (Kuwait)
・ Carmel School Digwadih
・ Carmel School, Kolkata
・ Carmel School, Padmanabhanagar
・ Carmel School, Perth
・ Carmel School, Rourkela
・ Carmel Schrire
・ Carmel Sepuloni
・ Carmel Shama
・ Carmel Sirianni
・ Carmel Snow
・ Carmel Symphony Orchestra
・ Carmel Tebbutt
・ Carmel Township, Michigan
・ Carmel transmitting station
Carmel Tunnels
・ Carmel Valley
・ Carmel Valley AVA
・ Carmel Valley Village, California
・ Carmel Valley, San Diego
・ Carmel Ventures
・ Carmel Winery
・ Carmel Zollo
・ Carmel, Anglesey
・ Carmel, Canlubang
・ Carmel, Carmarthenshire
・ Carmel, Flintshire
・ Carmel, Gwynedd
・ Carmel, Har Hebron
・ Carmel, Indiana


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Carmel Tunnels : ウィキペディア英語版
Carmel Tunnels

The Carmel Tunnels ((ヘブライ語:מנהרות הכרמל), ''Minharot HaCarmel''; also known as Route 23) are a set of road tunnels in Haifa, Israel. The tunnels' purpose is to reduce road congestion in the Haifa area and to provide an alternate route of reaching the eastern and central parts of the city, Haifa Bay and the Krayot area to and from Israel's central coastal plain without having to travel through traffic-congested downtown Haifa, having to drive up and across the Carmel Mountain or bypassing Haifa from the east, along the edge of the Jezreel Valley (via Highway 70 for example). The tunnels cut the travel time from the Haifa South interchange in the west to the Checkpost interchange in the east from 30–50 minutes down to 6 minutes.
The tunnels were built and are operated as a BOT project, and driving in the tunnels requires paying a toll. They were opened to traffic on 1 December 2010.〔Ron Freidman, (There’s light at the end of the Carmel Tunnels ), Jerusalem Post, December 1, 2010〕
==Overview==
The entire project is 8.6 km long. There are four tunnels (two sets of twin tunnels), the 3.5 km long western set and the 1.6 km long eastern set, containing two lanes of traffic in each tunnel. The tunnels were bored in the Carmel Mountains, essentially under the city of Haifa and have three portals: one from the west, near the MATAM business park (with a connection to the Coastal Highway and the Old Haifa–Tel Aviv Highway), one in the center off Rupin Road (next to the Grand Canyon Shopping Mall), and from the east connecting to the Krayot (aka the "Checkpost") interchange and Highway 22 at the Yadin/Mevo Carmel interchange.
The project was built by Carmelton, a subsidiary of Ashtrom and Shikun UVinui, two of the largest infrastructure companies in Israel, and the tunnels were bored by CCECC, a Chinese company specializing in tunnel boring.
In January 2009, boring was completed on the westbound tunnel in the eastern portion of the project. Boring of the last tunnel was completed on June 1, 2009. The cost for drivers is 6 NIS for each segment (a drive to the central portal is considered one segment and driving the entire east-west route is composed of two segments). Payment can be made in cash at a toll booth or by video tolling using automatic number plate recognition for subscribers who arrange a billing relationship or by video or transponder tolling for Highway 6 subscribers. The total cost of the project will be approximately 1.2 billion NIS (300 million US Dollars in December 2008 prices).
In early March 2014 construction was completed on a connector between the tunnels' eastern portal and Highway 22. This connector is the final link between a series of controlled access highways that together form an inter-city highway corridor stretching along most of Israel's Mediterranean coast, from Acre (Akko) in the north to Ashdod in the south. This corridor consists of whole or parts of highways 22, 23, 2, 20 and 4.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Carmel Tunnels」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.